Managed service plans
We run your environment, with 24/7 monitoring, maintenance, and proactive improvement.
Availability is a design decision, made before the outage that tests it. Fortified Data designs, builds, and failover-tests high availability and disaster recovery against the recovery time and recovery point objectives your business has set, so the first real failover is not the first one anyone has run.
Failover tested before go-live. Senior US-based consultants.
High availability keeps a database running through the failure of a server or component, usually with automatic failover. Disaster recovery restores service after the loss of a site or environment. Most designs need both, set against separate recovery objectives.
Your current servers, SQL Server installation, database inventory, and configuration, checked for what an availability design requires.
Windows Server Failover Cluster, availability groups, and listeners, with new SQL Server installations where needed.
Planned and sequenced around your maintenance windows.
Automatic and manual failover scenarios tested and confirmed before go-live.
Server names, IP addresses, listeners, and critical services, written for the team that runs the environment next.
Stabilization support and a documented project close-out.
SQL Server Always On availability groups and Windows Server Failover Clustering, Azure SQL Managed Instance failover groups, and MySQL failover orchestration.
Your application team updates connection strings and tests the applications against the new environment; we coordinate the failover testing and cutover with them.
An availability design is only as good as its last failover test. Our Signature plan manages your HA/DR environment and tests failover every year.
High availability keeps a database running through the failure of a server or component, usually with automatic failover. Disaster recovery restores service after the loss of a site or environment. Most designs need both, set against separate recovery objectives.
Automatic and manual failover scenarios are run and confirmed before go-live, and the results are recorded in the as-built documentation.
Yes. Many of our upgrade projects include a new availability group, built as part of the move.
Your team, with the documentation and knowledge transfer from the project, or Fortified Data under a Signature managed service plan.
An availability design is a project with an end date. If you would rather we ran the environment, or you want senior specialists on call for the next one, these are the other ways to work with us.
We run your environment, with 24/7 monitoring, maintenance, and proactive improvement.
A guaranteed 15-minute emergency response plus monthly on-demand hours that bank when unused.
Project-based engagements for migrations, performance tuning, data modernization, business intelligence, and high availability and disaster recovery.
The first conversation covers your current environment, the recovery time and recovery point your business needs, and the gap between the two.
Let us show you what's possible.